Dr. Tarek Hegazy: My FREE Educational Software
17. EasyPlan Program for Integrated Project Management
A simple but powerful spreadsheet program for integrated project management.
This is a complete system for estimating, scheduling, cash flow analysis, site layout planning, cost optimization, project control, and delay analysis. All the contractor needs for a competitive edge. Now has repetitive scheduling features.
More information in: www.opteam1.com under products. We customize EasyPlan to your training and professional needs.
16. BAL: Linear and Repetitive Schedulin on Microsoft Project Software
A comprehensive program for repetitive scheduling for multi-site infrastructure networks.
BAL-1.exe Version 1: Download and expand it into a separate directory.
After expanding the file, click on the "lob.bat" to setup some controls.
Make sure MS macro security is LOW to allow macros to work.
Run the Microsoft Project file (BAL-1.mpp) which activates the macro Auto_Open.
BAL-2.exe Version 2 (TRB paper on Highway construction, 2005)
Download and expand it into a separate directory.
After expanding the file, click on the "lob.bat" to setup some controls.
Make sure MS macro security is LOW to allow macros to work.
Run the Microsoft Project file (BAL-2.mpp) which activates the macro Auto_Open.
Check the professional version here: www.opteam1.com under products. We customize BAL to your professional needs.
15. Simple Bridge Management Spreadsheet
Simple Program for Bridge Management Decisions.
Bridge Management Download and run from Excel.
14. GA for Dynamic Project Control
Hegazy, T., and Petzold, K. (2003) "Genetic Optimization for Dynamic Project Control," Construction Engineering and Management, ASCE, Vol. 129, No. 4.
EasyPlan-Control.zip Unzip the excel file to a directory, then activate it.
13. Delay Analysis Using Daily Windows Analysis
12. Decision-Making DEMO Software
E-Choice.exe Self expanding file. Try it on the college probelm.
11. Excel Sheets for Subcontractor MIS and Schedule Optimization
a) Hegazy, T., and Ersahin, T. (2001) "Simplified Spreadsheet Solutions: I. Subcontractor Information System," Construction Engineering and Management, ASCE, Vol. 127, No. 6, pp.461-468.
Subcontractor-MIS.xls Excel worksheet for the above paper.
b) Hegazy, T., and Ersahin, T. (2001) "Simplified Spreadsheet Solutions: I. Subcontractor Information System," Construction Engineering and Management, ASCE, Vol. 127, No. 6, pp.469-475.
Schedule-Optimization.xls Excel worksheet for the above paper.
10. Resource Allocation and Leveling Using Genetic Algorithms
Reference: Hegazy, T., (1999) "Optimization of Resource Allocation and Leveling Using Genetic Algorithms," Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp.167-175.
SCH-LEVEL.mpp Microsoft Project 98 file with macro "Scheduling_Leveling".
9. Time-Cost Trade-Off Analysis Using Genetic Algorithms
Reference: Hegazy, T. (Dec. 1999) "Optimization of Construction Time-Cost Trade-Off Analysis using Genetic Algorithms," Canadian Journal of Civil Engineering, CSCE, Canada.
TCT-GA.mpp Microsoft Project 98 file with macro "TCT-View" to view optional construction methods and macro "TCT-Optimize" to start a Genetic Algorithm procedure for Time-Cost Trade-Off analysis.
8. Resource Allocation with Different Heuristic Rules
resource-scheduling.mpp Microsoft Project File with Resource Allocation macro.
7. Predicting the Structural Behaviour of Concrete Slabs Using Neural Networks
Reference: Hegazy, T., Tully, S., and Marzouk, H., "A Neural Network Approach for Predicting the Structural Behaviour of Concrete Slabs," Canadian Journal of Civil Engineering, CSCE, Vol. 25, pp. 668-677.
Slab.exe Self-extracting file containing an Excel spreadsheet (Comp.xls) and six support files. Read the note on first spreadsheet.
6. Parametric Cost Estimating for Highway Projects Using Neural Networks
Reference: Hegazy T., and Ayed, A., (1998) "A Neural Network Model for Parametric Cost Estimation of Highway Projects," Journal of Construction Engineering and Management, ASCE, Vol. 24, No. 3, pp. 210-218.
Amr-adpt.xls Excel Spreadsheet with the Neural Network Model.
Amr-sens.xls Sensitivity Analysis Excel Spreadsheet.
5. Excel Sheet for Site Layout Planning
Reference: Hegazy, T., and Elbeltagi, E., (2000) "Simplified Spreadsheet Solutions: Model for Site Layout Planning," Vol. 42, No. 1, Cost Engineering, AACE International, AACE.
Site-Layout.xls Excel Spreadsheet with the Spreadsheet Model.
4. Excel Sheet for CPM
Reference: Hegazy, T., and Ayed, A. (1999) "Simplified Spreadsheet Solutions: Models for CPM and TCT Analyses," Cost Engineering, AACE International, AACE, Vol. 41, No. 7, pp.26-33.
CPM.xls This Excel worksheet shows a simple and powerful CPM model. Try it.
3. Excel Sheet for CPM with a Bar Chart
CPM-BarChart.xls This Excel worksheet shows a simple and powerful CPM model. Try applying cash flow calculations on it.
2. BID: A program for bidding stategy models
Reference: Moselhi, O. and Hegazy, T., (1990) "Optimum Markup Estimation: A Comparative Study," Proceedings of the 11th International Cost Engineering Congress, 6th AFITEP Annual meeting, Paris, France, pp. M.2.1-8.
Bidding.exe Download and copy this self expanding file to a separate directory. Type BID to start. This is a DOS program.
1. ProBID v. 3.0: Decision-Support Software for Construction Bidding
Disk1.exe Disk1 of ProBID
Disk2.exe Disk2 of ProBID
Download the two files, copy them to a separate directory and expand them. Type PB to start. This is a DOS program requiring about 5 Meg of hard disk space after expansion.